CKI provide a wide range of hand tools, tool storage, power tool accessories and security products suitable for professional, industrial and consumer use. The company’s UK headquarters decided to install solar PV on their roof in order to provide future energy security for the business. It is hoped that the system will contribute to 15% of the warehouse’s overall energy usage. Dulas were selected to provide project management and installation services. Dulas engineers worked hard to achieve a tight FIT deadline for the customer.

CKI Ltd Headquarters 50kW retrofit PV installation
CKI Ltd Headquarters 50kW retrofit PV installation

Implementation

Hyundai models were chosen as they have IEC 61701 salt mist corrosion test certification (location of install was very close to the sea). All mounting equipment was thus anodised aluminium and high grade stainless steel to ensure continuation of mechanical performance. Due to the shallow pitch off the roof elevation rails were employed to increase the mounting angle of the array to improve the modules ability to self-clean and increase energy yield.

Technical Overview

  • System Size: 50 kWp
  • Annual Output: 99, 177 kW
  • Annual CO2 Savings: 56, 322 kg
  • Inverters: 4 Fronius IG Plus
  • Mounting System: Schletter Fix-Z 7 optimum elevation rails
  • Modules: Hyundai